JCD is currently on site delivering a comprehensive structural and internal fit-out package for Farrans Construction at Clore Manor, a new six-storey care home development in Hendon. The scheme provides 108 high-specification bedrooms alongside secure basement parking. JCD’s scope of work spans the entire building envelope and internal finishes, comprising structural steel framing systems (SFS) alongside complete internal drylining, partitions, linings, MF ceilings and meticulous tape and joint finishes.
Operating within a highly constrained, live roadside environment, JCD works in close coordination with the Farrans project management team to ensure seamless logistical delivery and minimal local disruption. To maintain uncompromised technical standards, a strict quality assurance framework is embedded across the project timeline: every phase of work, from initial structural framing to final finishing, is independently inspected and formally signed off on JCD’s proprietary inspection records before subsequent stages commence.















