Queensbridge board rainscreen elevation, Hackney

Projects / Queensbridge

Façade remediation

Queensbridge

Combustible façades were stripped back to the existing steel framing system (SFS) and replaced with A2-s1,d0 rated systems while residents remained in occupation. Following RIBA Stage 4 and 5 design development in line with tested system parameters, we installed three non-combustible cladding systems. Comprehensive cavity barriers were integrated at all floor levels, party walls, openings, and system interfaces.

Full statutory and compliance sign-off has been achieved, including Building Control approval under the Building Regulations, a PAS 9980 FRAEW, and EWS1 certification. All replacement cladding was specified and installed to a minimum standard of A2-s1,d0.